What if I fail to take out a permit?
Work that is done without a permit may not meet the Land Use Bylaw or the minimum building code requirements and could result in substandard construction that may not be structurally adequate. This could lead to costly repairs in the future to correct the problem or even a complete failure of the construction. Work that cannot be made to comply will require removal. The cost of a permit “after the fact” bears a penalty of $500.00. Legal action may be initiated to ensure compliance.